Feasibility of Management Plan in Electric Power Structure using Close-Range Photogrammetry

근거리사진측량방법을 이용한 전력구조물의 유지관리방안

  • Published : 1995.12.01

Abstract

The facilities of electric power plant which were constructed in and after the 1960's are superannuated in these days. We are expanding them applying an incressary to secure a safe plan for them. In this study, for a feasibility of management plan in electric power structure, a RC test prame was manufactured for monitoring and calculation of variation using close range photogrammetry. On the basis of this data, monitoring and calculating of variation in soil wall building site were carried out. Also a survey and analysis of a influence which occured to a structure near by exactitude site. All of these afford data for a management plan in electric power structure.

1960년대 이후 건설된 발전시설들이 오늘날에 이르러 노후화 되었고, 급속히 늘어나는 전력 소비량을 충당하기 위해 각종 발전시설들이 확충되고 있다. 따라서 이들 시설물에 대한 안전성확보차원의 조치가 이루어져야 한다. 본 연구에서는 전력구조물의 유지관리방안마련에 대한 일환으로 RC시험보를 제작 구성하여 외력작용시 RC시험 보의 변형 상태에 대한 모니터링과 변형량 산출을 위해 근거리사진측량방법에 대한 방법을 모색하였고, 이를 토대로 토류벽공사현장에 대한 변형량산출 및 모니터링을 통한 변형상태 파악 및 지하굴착으로 인한 인접구조물에 미치는 영향을 측정·해석 하므로서 전력구조물에 대한 유지관리에 활용할 수 있는 자료를 제공하였다.

Keywords