Abstract
The use of TBM has been rapidly increased in recent years since TBM has been introduced to Korea in 1985 and Korea came to occupy 27% of TBM holding ratio in the world. Despite a lot of experience, study on promoting the efficiency of TBM excavation is insufficient. The factors that influence the efficiency of excavation are the mechanical farttor geotechnical factor and management factor. The study on the efficiency of excavation has focused on the improvement of mechanical factor. But geotechnical factor is also very important and by this factor engineer can estimate the applicability of TBM. The purpose of this paper is to understand the effectiveness of TBM excavation for vari orts rock quality by analysing relations between rock quality and TBM excavation.
1985년 국내에 처음으로 TBM(tunnel boring machine) 공법이 도입된 이래, 최근 그 사용이 급격히 증가하여 전세계 TBM 보유율의 27%를 차지하게 되었으며 상당한 시공실적도 가지게 되었다. 그러나 TBM 공법에 의한 많은 시공실적에도 불구하고 TBM의 굴착효율을 증진시키기 위한 연구는 미흡한 편이다. TBM 공법의 굴착효율에 영향을 미치는 인자로는 기계적 요인, 지반공학적 요인과 현장운영 상의 요인을 들 수가 있다. 이때까지의 굴착효율을 높이기 위한 연구는 주로 기계적 요인의 개선방안에 대해서 중점적으로 다루이져 왔지만 지반공학적 요인도 매우 중요하며 암반이 갖고 있는 물리적 특성에 따라서 사전에 TBM 공법의 적용여부를 판단할 수 있으며, 또한 현장 암반조건에 적합한 TBM 종류를 선택할 수도 있다. 본 논문의 목적은 실제 TBM 공법 적용 현장에서 얻어진 암반에 대한 자료와 제반 TBM 굴착작업과의 관계를 분석하고, 암반조건에 따른 TBM 굴착효과를 구명하고자 하였다.