Abstract
This study aims at suggesting an alternative to improve current capacity of flood control for the existing Soyanggang multi-purpose dam which was constructed 20 years ago as a largest dam in Korea. The newly estimated value of the probable maximum precipitation(PMP) is 760.0 mm which is based on the hydrometeorological method. The peak inflow of 1000 years return period at the time of construction was 13,500$m^3$/s. However, the newly estimated peak inflow of the PMF is 18,100$m^3$/s which is 1.34 times bigger than the original one. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared; (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing one, (3) raising the existing dam crest, (4) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang multipurpose dam. The preliminary evaluation of these alternatives resulted in that the second alternative is most economical and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multi-purpose dam, a detailed study of an additional spillway tunnel has to be followed.
본 연구의 목적은 20년 전에 건설 완료된 우리나라 최대 다목적댐인 소양강 다목적댐의 치수능력을 재검토하여 그 대안을 제시하는데 있다. 최악의 기상조건을 고려하여 수문 기상학적 방법으로 산정한 소양강 다목적댐유역의 72시간 지속 가능 최대 강수량(PMP, probable maximum precipitation)은 760.0mm 이며 재산정된 가능 최대 홍수량(PMF, probable maximum flood)은 18,100$m^3$/s이다. 이는 댐 계획 당시 1,000년 빈도 홍수량의 최대치 13,500$m^3$/s 보다 1.34배 크게 나타났다. 가능 최대 홍수량을 설계 홍수량으로 채택할 경우의 4개 대안; 1) 하수 제한수위를 낮추는 안, 2) 비상 여수로를 추가하는 안, 3)기존 댐을 증고시키는 안, 4) 상류에 홍수조절용댐을 건설하는 안 등을 검토한 결과 경제성과 치수 관리 능력 효율면에서 소양강 다목적댐의 수문학적 안정성을 도모할 수 있는 최적의 개선 방안은 비상 여수로를 추가하는 안으로 판단된다. 따라서 현 여수로에 부가하여 비상 여수로를 추가하는 방안이 보다 더 구체적으로 검토되어야 할 것이다.