터널굴착에서 다단식 발파기에 의한 전단면 발파의 적용성 연구
Application of Full-Face Round by Sequential Blasting Machine in Tunnel Excavation
초록
Many methods and techniques to reduce ground vibrations are well known. Some of them are to adopt electric millisecond detonators with a sequential blasting machine or an initiating system with an adequate number of delay intervals. The types of electric detonators manufactured in korea include instantaneous, decisecond and millisecond delays but numbers of delay intervals are only limited from No.1 to No.20 respectively. It is not sufficient to control accurately millisecond time with these detonators in tunnel excavation. Sequential fire time refers to adding an external time delay to a detonators norminal firing time to obtain sequential initiation and it is determined by sequential timer setting. To reduce the vibration level, sequential blasting machine(S.B.M) with decisecond detonators was adopted. A total of 134 blasts was recorede at various sites. Blast-to-structure distances ranged from 20.3 to 42.0 meter, where charge weight varied from 0.24 to 0.75 kg per delay. The results can be summarized as follow: 1. The effects of sequential blasting machine on the vibration level are discussed. The vibration level by S.B.M are decreased approximately 14.38~18.05% compare to level of conventional blasting and cycle time per round can be saved. 2. The empirical equations of particle velocity were obtained in S.B.M and conventional blasting. V=K(D/W1/3)-n, where the values for n and k are estimated to be 1.665 to 1.710 and 93.59 to 137 respectively. 3. The growth of cracks due to vibrations are found but the level fall to within allowable value.
키워드