Acknowledgement
Supported by : 한국학술진흥재단
The purpose of this investigation is to point out the physical fixation and stability of banking slopes of forest roads by invasion of trees. We investigated the situations of sediment discharge and coverage of invaded trees at banking slopes of forest roads. The coverage of invaded trees were calculated from crown injection based on the stable slope and was compared with length of slope, slope gradient, and passage years after construction of forest road. 1. We investigated on the sediment discharge and the invasion of trees at banking slopes, which were actually observed 8 forest roads of Kyonggi-Do and Kangwon-Do. 2. There was no physical stability of the banking slope due to the surface erosion and slope failure, but the tree invasions were active at the stable plots. 3. The length of slope was constructed to 4.0m to 61.0m and recent forest road was mainly constructed to the slopes longer than 30m. There was strong regional effect between the length of slope and the coverage of invaded trees and the above two factors were inversely proportional to each other. 4. There was no significant relationship between the slope gradient and the coverage of invaded trees and the slope constructed within the angle of repose showed the relatively high coverage of invaded trees. 5. There was no significant relationship between the passage years and the coverage of invaded trees in the same investigative region after the construction of forest road. But there was a gradually increasing relationship of tree invasion between above two factors. However, there was some limitation to expect the invasion of the tree species. 6. In the light of the above results, we suggest that the construction of forest road may need foundation work and vegetation work simultaneously for the physical stability to make the environment of tree plantation and that the reasonable increase of construction cost of forest road may be prior to the other factors.
일반적으로 시공후(施工後) 방치되고 있는 임도(林道)의 성토사면(盛土斜面)에 있어서 물리적(物理的) 고정(固定)과 목본(木本)의 자연침입(自然侵入)에 의한 사면(斜面) 안정(安定)에 대한 기초자료의 제공을 목적으로 현지조사(現地調査)를 실시하였으며, 성토사면(盛土斜面)의 사면(斜面)길이, 사면(斜面)물매 및 시공후(施工後) 경과년수(經過年數)에 따른 목본(木本)의 자연침입율(自然侵入率)에 대하여 비교(比較), 분석(分析)하였다. 또한 이를 기초로 수관투영면적(樹冠投影面積)에 의한 목본침입율(木本侵入率)을 구하였으며, 이를 사면(斜面)길이, 사면(斜面)물매 및 임도개설후(林道開設後) 경과년수(經過年數)와 대비(對比)하여 보았다. 1. 경기도(京畿道)와 강원도(江原道) 일원에 시공(施工)된 7개 노선(路線)(경기도(京畿道) 가평군(加平郡)의 소법로(所法路), 개곡록(開谷路), 중부(中部) 임업시험장(林業試驗場)의 접동로(接洞路), 마명로(馬鳴路), 직동로(直洞路) 및 육림로(育林路), 강원도(江原道) 춘천군(春川郡)의 방하로(芳荷路))을 대상으로 성토사면(盛土斜面)의 토사유출(土砂流出) 및 목본침입(木本侵入)의 실태(實態)를 조사하였다. 2. 성토사면(盛土斜面)은 표면침식(表面侵蝕) 및 사면각부(斜面脚部)의 붕괴(崩壞)에 의해 사면(斜面)의 물리적(物理的) 안정(安定)이 이루어지지 않았으나, 안정화(安定化)된 구간에는 목본침입(木本侵入)이 진행되었다. 3. 성토사면(盛土斜面)의 사면(斜面)길이는 4.0~61.0m로 조성되었으며, 최근의 임도개설지(林道開設地)는 30m이상의 장대사면(長大斜面)이 다량으로 조성되었다. 사면(斜面)길이와 목본침입율(木本侵入率) 사이에는 지역적(地域的)인 영향을 강하게 받고 있으며, 구역별(區域別)로는 사면(斜面)길이와 목본침입율(木本侵入率)은 반비례(反比例)하였다. 4. 사면(斜面)물매와 목본침입율(木本侵入率)과는 전체적으로는 상관관계(相關關係)가 인정되지 않았으나 안식각(安息角) 이내로 조성된 사면(斜面)은 상대적으로 목본침입율(木本侵入率)이 높게 나타났다. 5. 임도시공후(林道施工後) 경과년수(經過年數)와 목본침입율(木本侵入率)은 동일 지역내에서는 명확한 상관관계(相關關係)는 확인되지 않았으나 전체적으로는 시공후(施工後) 경과년수(經過年數)에 비례하여 목본침입율(木本侵入率)도 증가하는 경향을 나타냈다. 그러나 목본(木本)의 자연침입(自然侵入)을 기대하는 데에는 한계가 있었다. 6. 따라서 임도시공(林道施工)에는 물리적(物理的) 안정(安定)을 위한 토목(土木) 기초공(基礎工)과 식생공(植生工)을 병행하여 식생(植生)의 생육환경(生育環境)을 정비(整備)해야 하며, 이를 위해서는 적정한 사면처리(斜面處理) 비용(費用)을 포함한 임도시공비(林道施工費)의 책정 등이 선행되어야 할 것이다.
Supported by : 한국학술진흥재단