Journal of Korean Society of Industrial and Systems Engineering (산업경영시스템학회지)
- Volume 16 Issue 28
- /
- Pages.165-171
- /
- 1993
- /
- 2005-0461(pISSN)
- /
- 2287-7975(eISSN)
A Study on Job Shop Scheduling with Overlapping Production
중첩생산을 고려한 개별생산방식의 일정계획에 관한 연구
Abstract
The algorithm of Giffler and Thompson is modified for solving job shop scheduling problems related to the overlapping production The start-lag and stop-lag are also applied New priority rules for the overlapping production are proposed and the efficiency of them is compared with that of the classical priority rules.
Keywords