An Approach to Double Hoist Scheduling in the Chemical Processes

  • Lim, Joon-Mook (Department of Industrial Engineering, Korea Advanced Institute of Science and Technology) ;
  • Hwang, Hark (Department of Industrial Engineering, Korea Advanced Institute of Science and Technology)
  • Published : 1993.08.01

Abstract

This paper deals with scheduling problem of the chemical process system where aircraft parts go through a given sequence of tanks filled with chemical solutions. The system has two hoists which move carriers holding the parts between tanks. A mixed integer programming model is developed from which a maximum throughput schedule can be found for the hoist movements. To show the validity of the model, a real world problem is solved and the results are compared with those with an existing approach.

Keywords