An Analysis of Hyd-Cylinder Shop Facilities Planning by Simulation
시뮬레이션 기법을 이용한 유압생산부 설비배치 계획의 분석
Abstract
This paper presents alternatives for facilities planning and analyses them using simulation approach. For this purpose, hydro-cylinder production line was sampled as a case study. Several facilities planning alternatives are evaluated based on the several factors such as line balancing, equipment utilization, optimum number of equipments, inventory size, flow time, bottleneck machine, and productive capacity. An optimal facilities planning is proposed based on the degree of meeting with the all factors evaluated. The simulation language employed in this study is SIMAN and the data used for simulation are provided by hydro-cylinder shop.