Acknowledgement
Supported by : 한국학술진흥재단
This paper presents a heuristic method for the Assembly Line Balancing(ALB) of the large-sized product. In the ALB problem of the large-sized product such as bus and truck, the assignments of the Related Task Groups(RTG), the same side tasks, and team tasks should be considered. In this paper, a new concept of the RTG and two kinds of assignment rules are proposed to resolve the above considerations. The first assignment rule allots the RTG with the constraint of the same side tasks to the station while the second allots the RTG to the station, relaxing the above constraint to increase the applicability of the method. An assignment rule for team tasks is also presented. The benefits of the method are to improve work methods, to give more job satisfaction to workers, and to allow greater flexibility in the design of assembly lines.
Supported by : 한국학술진흥재단