Journal of Korean Society of Industrial and Systems Engineering (산업경영시스템학회지)
- Volume 13 Issue 21
- /
- Pages.91-100
- /
- 1990
- /
- 2005-0461(pISSN)
- /
- 2287-7975(eISSN)
A Development of Optimal Algorithms for N/M/D/F/Fmax Scheduling Problems
N/M/D/F/Fmax 일정계획 문제에서 최적 알고리듬의 개발
Abstract
This paper is concerned with the development of optimal algorithms for multi-stage flowshop scheduling problems with sequence dependent setup times. In the previous researches the setup time of a job is considered to be able to begin at the earliest opportunity given a particular sequence at the start of operations. In this paper the setup time of a job is considered to be able to begin only at the completion of that job on the previous machine to reflect the effects of the setup time to the performance measure of sequence dependent setup time flowshop scheduling. The results of the study consist of two areas; first, a general integer programming(IP) model is formulated and a nixed integer linear programming(MILP) model is also formulated by introducing a new binary variable. Second a depth-first branch and bound algorithm is developed. To reduce the computational burdens we use the best heuristic schedule developed by Choi(1989) as the first trial. The experiments for developed algorithm are designed for a 4
Keywords