한국지반공학회지:지반 (Geotechnical Engineering)
- 제6권3호
- /
- Pages.5-12
- /
- 1990
- /
- 1229-215X(pISSN)
노천 굴착에서 발파 진동의 크기를 감소시키기 위한 정밀발파
Careful Blasting to Reduce the Level of Ground Vibration in Open Excavation
초록
In this paper, ground vibration and other properties measurements were conducted to deter mine empirical equation based on careful test blasting with crawler drill(diameter 70-75mm). The empirical euqations for ground vibration are obtained as follows where V is peak particle velocity in cm 1 sec, D is distance in m and W is maximum charge weight per delay in kg
키워드