작업표준시간산출(作業標準時間算出)의 전산화(電算化)와 적용사례(適用事例)

A Study on Computer-Generated time Standard Calculations with Applications

  • 유병남 (인하대학교 공과대학 산업공학과) ;
  • 신현표 (인하대학교 공과대학 산업공학과)
  • 발행 : 1988.04.30

초록

Since many small and medium sized enterprises in Korea have lack of funds to install a commercial computer packages for work standards and work scheduling. This study has been attempted to develop the computer-generated package to ease those problems. The system consisted of three major parts. The first part is a work measurement program applying W.F.(work factor) predetermined time standards for work standards. The second part is a work scheduling program which calculates each operator's machine and job allocation. The last part is a control program for the production outputs and the machine utilization monitoring. The system is programmed by dBASE III for the IBM-PC compatibles for the sake of user's conveniences.

키워드