On the Simultanously Determining the Schedule and Crew Size for Optimal Preventive Maintence

수리일정계획(修理日程計劃)과 보수반원(補修班圓)크기의 동시적(同時的) 결정(決定)에 관한 연구(硏究)

  • 김길동 (동국대학교 산업공학과 대학원) ;
  • 조암 (동국대학교 산업공학과) ;
  • 이진규 (동국대학교 산업공학과)
  • Published : 1987.06.15

Abstract

Past treatment of the single machine maintenance problem has shown that preventive maintenance may be desirable for equipment for which failures are caused at least partially by wear-out factors. In all previous treatment, however, the size of the maintenance-repair crew has been held constant and the optimal maintenance period has then been determined. This paper suggests a simultaneous solution for the maintenance-repair crew size and the optimal maintenance period. The optimal maintenance period is seen to shift as the size of the maintenance-repair crew varies.

Keywords