A Study on Critical Ratio Scheduling for Determining the Relative Priority

상대적(相對的) 작업우선순위(作業優先順位) 결정(決定)을 위한 긴급율법(緊急率法)에 관한 사례연구(事例硏究)

  • Published : 1987.11.25

Abstract

The purpose of this paper is to find out the relative priority among the queueing products for next operation. Critical ratio scheduling is a technique for use in production scheduling to establish and maintain relative priority among the jobs. The relative priority is based on a ratio of when the completed job is required and how much time is required to complete it. A numerical example of "D" company is solved. Jobs are classified into 3 categories; the behind scheduling jobs, the on time jobs and the ahead scheduling jobs.

Keywords