초록
Automatic and manual rain smaplers wre installed at the roof of National Institute of Environmental Research (NIER), and the rain sampling and measurement were conducted during the period April to August 31, 1987. The rain sampling and measurement were carried out in the following manners: The 1st : Acidity and conductivity were measured entirely by automatic rain sampler (continuous measurement) The 2nd : Acidity and conductivity wrer measured in the laboratory with the sample that was taken out of automatic rain sampler. The 3rd : Acidity and conductivity were measured in the laboratory with the sample that was taken out of manual rain sampler. Afterwards, those different measurement values were compared each other and the following conclusions were obtained: 1) The pH of the continous measurement by the automatic sampler was lower than that of the laboratory measurement, and it was reversed in case of the conductivity. 2) The significance was recognized at 5% risk ratio for the population mean of difference of the measurement values of the pH and conductivity from both samples. 3) The significance was not recognized at 5% risk ratio by the analysis of variance by one way layout for the pH and conductivity. 4) The significance was recognized at 5% risk ratio by the analysis of variance by two way layouts for the pH conductivity. 5) The significance was recognized at 5% rrisk ratio for the differences of the pH values obtained by oboth samplers, and no significance was recognized for conductivity. 6) In comparison of the measurement values from the two samplers were shown a good correlation for pH; correlation coefficient (r) = 0.63, and regression equation Y = 0.53X + 2.78. For conductivity, the correlation was also excellent; correlation coefficient (r) = 0.53 and regression equation Y = 0.63X + 5.65.