품질경영학회지 (Journal of Korean Society for Quality Management)
- 제14권2호
- /
- Pages.40-46
- /
- 1986
- /
- 1229-1889(pISSN)
- /
- 2287-9005(eISSN)
프로젝트견적(見積)과 한계분석(限界分析)
Project Estimating and Marginal Analysis
초록
The decision maker has the job of torecasting capital investments and operating expenses to aid the decision making in choosing and evaluating present and future alternatives. The estimating function eventually analysis, evaluates and choose the alternatives. The analysis stemmed originally from a preliminary design of some sort, and eventually plans are started to investigate investment possibilites. This study provide the descounted cash flow and the present worth method. Despite any choice of an analytical method, there remains the problem of predicting certain future events. Therefore, these models dealing with optimum plant sizing, equipment replacement, and lease or buy will be discussed.
키워드