A Felling Work Study for Thinning Japanese Larch

일본잎갈나무 간벌림(間伐林) 벌목작업(伐木作業) 연구(硏究)

  • Received : 1986.05.26
  • Published : 1986.06.30

Abstract

The processing times of the works, chainsaw felling, axe trimming and hand skidding to the corridor, by one-man-work method per single pole timber were investigated in the thinning young Japanese larch stand at the Training Forests of the Forest Work Tranining Center in Kangwon-do. The works were performed by a skilled worker with the craftman qualification and 69 trees were cut. Time was checked at intervals of 25/100 minute by the multimoment method and the worker's efficiency was evaluated for every cycle. Total working time was 8.11 hours of which 90% was for thinning work and 10% for cleaning work. Of the total working hours, 82.7% was net working time, 12.3% was general working time and 4.9% was non-valuated time. Of the net working time, 5.9hours, for only thinning, 20.9% was spent on moving to the feeling tree, 27.1% was spent on felling, 40.5% was spent on trimming and 11.5% was spent on skidding to corridor. Net chainsaw operating time was 0.94 hour which included 0.2 hour for cleaning work. Of the net chainsaw operating time, 0.94 hour, 66% was operating time and 34% was idle running time. The basic and general working times by DBH classes with application of 130% worker's efficiency calculated from regression equations were shown in table 1. For better practical using of this table, the simplified proposal was given in table 2.

일본잎갈나무 일차간벌림(一次間伐林)에서 간벌장재(間伐長材)의 매목별(每木別) 벌목(伐木)-소운반(小運搬)까지 공정(功程)을 알기 위하여 1인(人) 단독(單獨)으로 기계톱벌목(伐木)-도끼가지치기-인력소운반작업(人力小運搬作業) 조직(組織)을 투입(投入)하였다. 작업장소(作業場所)는 임업기계훈련원(林業機械訓練院) 27 임반(林班)에서 영림기능인(營林技能人) 2급자격자(級資格者)에 의거 작업(作業)을 시키고 69 본(本)을 조사(調査)하였다. 동연구(同硏究)의 또 하나의 주요목적(主要目的)은 지역별(地域別) 공정표제작방법(功程表製作方法)을 도입(導入) 보급(普及)시키는데 있었다. 시간(時間)은 25/100분(分) 간격으로 관측을 하였으며 매 싸이클별 작업자(作業者)者의 능률(能率)을 사정하였다. 총 작업시간은 8.11시간(時間)이며 이 중 간벌작업(間伐作業)이 90%, 제벌작업(除伐作業)이 10%을 점하고 있다. 시간유형별(時間類型別)로는 순작업시간(純作業時間)이 82.7%, 일반작업시간(一般作業時間)이 12.3%이고 측정불필요시간(測定不必要時間)이 4.9% 이었다. 간벌(間伐)을 위한 순작업시간(純作業時間)은 5.9시간(時間)이며 이 중 간벌목(間伐木)으로 이동시간(移動時間)이 20.9 %, 벌목(伐木)이 7.1%, 가지치기가 40.5%이고 집재로(集材路)까지의 운반(運搬)이 11.5%이었다. 기계톱의 순작업시간(純作業時間)은 0.94시간(時間)(이 중 제벌작업(除伐作業)이 0.2시간(時間))이며 가동시간(可動時間)이 66%, 공전시간이 34%를 점하고 있었다. 직경급별(直徑級別) 공정(功程)을 얻기 위하여 회귀식(回歸式)을 구하고, 작업원(作業員)의 능률(能率)은 130%로 사정하여 기본시간(基本時間)과 일반시간(一般時間)을 구하였던 바 표(表) 1과 같은 결과를 얻었다. 표(表) 1은 활용시(活用時) 복잡할 것으로 예상하여 공정표(功程表)를 표(表) 2와 같이 제안(提案)하여 실용화(實用化) 되도록 하였다. 작업관리(作業管理)를 합리화(合理化)시키기 위해서는 상기(上記)와 같은 공정표제작방법(功程表製作方法)의 도입(導入)은 바람직한 결과를 주게 될 것이다.

Keywords