A Study on the Comparison of Production Activity Using Work Sampling Method of Two Periods After/Before Process Change

공정변화전과 후 두기간에서의 워크.샘플링법에 의한 생산활동 비교에 관한 연구

  • 이근희 (한양대학교 산업공학과) ;
  • 박상민 (한양대학교 산업공학과)
  • Published : 1982.12.01

Abstract

This thesis deals with the method of Work Sampling to compare production activity due to change of productivity, workmen's productivity environment, nonproductivity of machine and plant when there is a process before and after change of work environments. So, this study takes $x^2$ - test to discover significant change of process, and obtains Proper observation number due to ratio difference-test over change of productivity before and after process change. Therefore, this thesis represent statistically effective results between two periods before and after process change.

Keywords