Journal of Korean Society for Quality Management (품질경영학회지)
- Volume 8 Issue 2
- /
- Pages.29-37
- /
- 1980
- /
- 1229-1889(pISSN)
- /
- 2287-9005(eISSN)
공장공학(工場工學)(P. E)에서의 종합적(綜合的) 품질관리(品質管理) T. Q. C. in Plant-Engineering
Abstract
The purpose of this study is to define the role of a T. Q. C. engineer in the plant engineering activities. A "plant engineering" moves to complete a new project through a series of stages such as: 1. Research & Development stage. 2. Economic evaluation & engineering design stage. 3. Erection & start up stage. 4. Final production & control stage. This suggests that the plant engineering project should be carried out with a wide variety of tasks, as well as a central control. For a successful completion of the project, a T. Q. C. engineer is required, in practice, either as a central activity creator or as a key advisor in each task.
Keywords