A Study on Sediment Load in the Milyang River

유사량 산정에 관한 연구 (밀양강을 중심으로)

  • Published : 1980.12.01

Abstract

This study is carried out to estimate the rate of sediment transportation both to measure the amount of suspended and bedload sediment that moves on or near the river bed and passes through the cross section of a river in unit time, with suspended and bed load samplers used for the Milyang river and to determine the most satisfactory and convenient formula of some formulas for sediment discharge by comparing the measured rate with the calculated rate. The results of this study are summarized as follows; 1) The interrelationship (1) between the total discharge and the total sediment discharge (2) between discharge and suspended sediment load and (3) between discharge and bed load in the Milyang river are (1) i) 4$\leq$Q$\leq$100 C.M.S. Qr=0. 00272 Q0.70 (kg/sec) ii) 150$\leq$Q$\leq$800 C.M.S. Qr=0. 4807 Q0.46 (kg/sec) (2) Qs~=0. 07576 Q1.02 (kg/sec) (3) QB=0. 00957 Q0.44 (kg/sec) 2) The rate of suspended sediment load to total sediment discharge is found to be about; 99%. The suspended load is shown to be almost wash load which consists of silt and clay. 3) The relation between the total discharge and the suspended sediment load that are measured at three medium and small rivers in Korea is Qs=0. 13831 Q0.97 (kg/sec) 4) Brown's formula is determined to be the most convenient formula for application and comparison with observed data obtained for the Milyang river.

Keywords