Drainage Analysis for the Anyang-cheon Upper-watershed Management Planning

유역관리계획수립(流域管理計劃樹立)에 관(關)한 기초적(基礎的) 연구(硏究)

  • Received : 1979.05.10
  • Published : 1979.06.30

Abstract

Such stream characteristics as the numbers, lengths, orders of stream channels, and drainage density are the essential elements for the analysis of drainages in planning of watershed management in a drainage basin. The drainage net is the pattern of tributaries and master streams in a drainage basin as declineated on a planimetric map. Stream order is a measure of the position of a stream in the hierarchy of tributaries. Density of the drainage is given by the quotient of the cumulative length of stream and the total drainage area. Drainage density then is simply a length per unit of area. In this study, the Anyang-cheon upper-watershed is selected for the survey and analysis of the stream system and drainage density in view point of the useful collection of data for effective watershed management planning. The Anyang-cheon upper-watershed is consisted of about 12,600 hectars of drainage area including the 13 Sub-stream. Total length of the Stream (as described in the Stream Law) in the survey area is measured as much as 71.2km, and that of the Small-stream as descrived in the Saemaul Stream Survey Book (1972) is calculated as 43,010 meters. Besides of this lengths, measured about 43,410 meters of the Small-stream and about 71,900 meters of the Torrential valley through this study. The range of the drainage density among the 13 Sub-streams having sub-watershed is analysed as from 14.79 to 24.10, and average value of drainage density in the entire watershed is calculated as 18.21 in case of including the length of the Torrential valley and 12.50 in case of excluding the same. It is required that the standard classification system in classifing for the characteristics of identification among the Stream, Sub-stream, Small-stream, Torrent, and Torrential valley must be satisfied through joint study of the authorities concerned.

우리나라에서는 치산(治山) 치수(治水) 이수사업(利水事業)의 계획(計劃)과 시행(施行)에 있어서 정부(政府) 각(各) 부처간(部處間)에 유기성이 결여되어 있으므로 합리적(合理的)인 유역관리계획면(流域管理計劃面)에서 비효율성(非効率性)을 내포하고 있는 것이다. 본(本) 연구(硏究)에서는 안양천상류유역(安養川上流流域)(약 12,600ha) 내(內)의 배수밀도(排水密度)를 15개(個) 소유역단위(小流域單位)로 조사(調査) 분석(分析)하였는데, 이 연구결과(硏究結果)는 장래 유역관리계획수립(流域管理計劃樹立)에 주요한 기초자료(基礎資料)가 될 것이다. 1. 안양천상류유역(安養川上統流域)은 13개 준용하천(準用河川)(수암천(秀岩川), 삼성천(三聖川), 삼막천(三幕川), 학의천(鶴儀川), 내손천(內蓀川), 호계천(虎溪川), 당정천(堂井川), 산본천(山本川), 오전천(五全川), 왕곡천(旺谷川), 갈현천(葛峴川), 청계사천(淸溪寺川), 학현천(鶴峴川), 소하천(小河川)(세찬(細川), 소천(小川), 중천(中川)), 그리고 계곡으로 주배수조직(主排水組織)을 이루고 있다. 2. 조사유역내(調査流域內)의 하천대장상(河川臺帳上)의 총하천(總河川) 연장(延長)은 71.2km이며 새마을하천표상(河川表上)의 소하천(小河川)의 총연장(總延長)은 43,010m인데, 소하천(小河川)에 있어서는 약 43,410m나 누락(漏落)되었음이 조사(調査)되었다. 그리고 계곡(溪谷)(계류(溪流))는 모두 91개(個)로서 총연장(總延長)은 71,900m에 달(達)한다. 3. 소유역단위(小流域單位)의 배수밀도(排水密度)의 범위는 계곡연장(溪谷延長)을 총연장(總延長)에 포함할 경우에 14.79~24.10(m/ha)이며, 조사유역전체(調査流域全體)의 평균배수밀도(平均排水密度)는 18.21이었다. 그러나 계류(溪流)를 포함하지 않을 때에는 12.50으로 저하되었다. 4. 합리적(合理的)인 치산치수사업(治山治水事業)을 수행하기 위한 유역관리계획(流域管理計劃)을 수립(樹立)하기 위해서는 "하천(河川)", "소하천(小河川)", "야계(野溪)" 및 "계류(溪流)"를 포함하는 모든 배수조직(排水組織)에 대한 일관성 있는 유로분류기준(流路分類基準)이 확립(確立)되어야 할 것이다.

Keywords