Magazine of the Korean Society of Agricultural Engineers (한국농공학회지)
- Volume 18 Issue 1
- /
- Pages.4079-4086
- /
- 1976
- /
- 0253-3146(pISSN)
A study on the quick graphical method of flood routing
홍수추적 속산도식해법에 대한 소고
Abstract
In many reservoir projects, economic considerations will necessitate a design utilizing surcharge. Determination of the most economical combination of surcharge and spillway capacity for a given spillway crest level will require flood routing studies and economic studies of the dam-reservoir-spillway combinations. Many methods of actual flood routing have been devised, each of them with its advantages and disadvantages. Some of these methods are listed below: (1) Arithmetical trial-and-error method. (2) Modified Puls' method (3) Cheng's graphical method (4) Horton's arithmetical method (5) Ekadahl's arithmetical method (6) Digital computer programming. For the purpose of preliminary design and cost estimating of dams and spillways, it is often required to estimate, for a given design flood and spillway crest level. the approximate values of two among the three characteristics of the spillway spillway length, maximum discharge and surcharge depth at maximum discharge, when one of these quantities is given. As is well known, the outflow hydrograph for an ungated overflow spillway assumes the form of a wave-shaped curve with a minimum point for Q=o At zero time and a maximum point for Q=Qmax at its intersection with the falling leg of the inflow hydrograph (see Fig. 4) The shaded area between the inflow and outflow hydrographs represents at the approximate scale the temporary retention Vt. In line with the remarks, draw by free hand the assumed outflow hydrograph with its maximum point for the given Qmax (see Fig. 4) and by planimetration find Vt. From the reservoir capacity curve (Fig. 3) find Vs for the given spillway crest level and make V=Vs+Vt. From the above curve find surcharge water elevation for V and surcharge depth Hmax over spillway crest. From the discharge formula compute {{{{L= { Q} over { { CH}^{3/2 } } }}}} The methed provides a means for a quick and fairly accurate estimation of spillway capacity.
Keywords