과제정보
The support of Guangdong Basic and Applied Basic Research Foundation (No. 2023A1515012558), Hong Kong Polytechnic University Carbon Neutrality Fund (No. P0043733), and Young Scientists Fund of National Natural Science Foundation of China (No. 72301232), Research Grants Council of the Hong Kong SAR of China (No. 15219422), and the National Natural Science Foundation of China (No. 72201228) are gratefully acknowledged. The support of China State Construction Hailong Technology Company Limited is acknowledged for the project cases (CSCI-2021-Z-10-07).
참고문헌
- S. Balasubramanian, V. Shukla, N. Islam, and S. Manghat, "Construction Industry 4.0 and Sustainability: An Enabling Framework," IEEE Trans. Eng. Manag., vol. 71, pp. 1-19, 2024, doi: 10.1109/TEM.2021.3110427.
- J. Hong, G. Q. Shen, Y. Peng, Y. Feng, and C. Mao, "Uncertainty analysis for measuring greenhouse gas emissions in the building construction phase: a case study in China," J. Clean. Prod., vol. 129, pp. 183-195, Aug. 2016, doi: 10.1016/j.jclepro.2016.04.085.
- A. Abdi, S. Taghipour, and H. Khamooshi, "A model to control environmental performance of project execution process based on greenhouse gas emissions using earned value management," Int. J. Proj. Manag., vol. 36, no. 3, pp. 397-413, Apr. 2018, doi: 10.1016/j.ijproman.2017.12.003.
- S. Chen, Y. Teng, Y. Zhang, C. K. Y. Leung, and W. Pan, "Reducing embodied carbon in concrete materials: A state-of-the-art review," Resour. Conserv. Recycl., vol. 188, p. 106653, Jan. 2023, doi: 10.1016/j.resconrec.2022.106653.
- Y. Zhang, W. Pan, and Y. Teng, "Reducing embodied carbon emissions of concrete modules in high-rise buildings through structural design optimisation," IOP Conf. Ser. Earth Environ. Sci., vol. 1101, no. 2, p. 022023, Nov. 2022, doi: 10.1088/1755-1315/1101/2/022023.
- J. Xu, Y. Teng, W. Pan, and Y. Zhang, "BIM-integrated LCA to automate embodied carbon assessment of prefabricated buildings," J. Clean. Prod., vol. 374, p. 133894, Nov. 2022, doi: 10.1016/j.jclepro.2022.133894.
- R. Pellerin and N. Perrier, "A review of methods, techniques and tools for project planning and control," Int. J. Prod. Res., vol. 57, no. 7, pp. 2160-2178, Apr. 2019, doi: 10.1080/00207543.2018.1524168.
- S. Globerson, "Impact of various work-breakdown structures on project conceptualization," Int. J. Proj. Manag., vol. 12, no. 3, pp. 165-171, 1994.
- X. Li, C. Wu, F. Xue, Z. Yang, J. Lou, and W. Lu, "Ontology-based mapping approach for automatic work packaging in modular construction," Autom. Constr., vol. 134, p. 104083, Feb. 2022, doi: 10.1016/j.autcon.2021.104083.
- Z. Liu, X. Li, C. Wu, J. Ma, Z. Yang, and Y. Guo, "Automatic work package sizing for cost-effective modular construction," Autom. Constr., vol. 154, p. 105003, Oct. 2023, doi: 10.1016/j.autcon.2023.105003.
- Y. Zhang, X. Li, Y. Teng, G. Q. Shen, and S. Bai, "A heuristic rule adaptive selection approach for multi-work package project scheduling problem," Expert Syst. Appl., vol. 238, p. 122092, Mar. 2024, doi: 10.1016/j.eswa.2023.122092.
- C.-L. Li and N. G. Hall, "Work Package Sizing and Project Performance," Oper. Res., vol. 67, no. 1, pp. 123-142, Jan. 2019, doi: 10.1287/opre.2018.1767.
- Y. Teng and W. Pan, "Estimating and minimizing embodied carbon of prefabricated high-rise residential buildings considering parameter, scenario and model uncertainties," Build. Environ., vol. 180, p. 106951, Aug. 2020, doi: 10.1016/j.buildenv.2020.106951.
- Y. Teng, C. Z. Li, G. Q. P. Shen, Q. Yang, and Z. Peng, "The impact of life cycle assessment database selection on embodied carbon estimation of buildings," Build. Environ., vol. 243, p. 110648, Sep. 2023, doi: 10.1016/j.buildenv.2023.110648.
- T.-K. Lim, H.-S. Gwak, B.-S. Kim, and D.-E. Lee, "Integrated carbon emission estimation method for construction operation and project scheduling," KSCE J. Civ. Eng., vol. 20, no. 4, pp. 1211-1220, May 2016, doi: 10.1007/s12205-015-0360-x.
- "ISO 21511:2018," ISO. Accessed: Oct. 31, 2023. [Online]. Available: https://www.iso.org/standard/69702.html
- K. Guo and L. Zhang, "Multi-objective optimization for improved project management: Current status and future directions," Autom. Constr., vol. 139, p. 104256, Jul. 2022, doi: 10.1016/j.autcon.2022.104256.
- H. Ren, W. Zhou, K. Nakagami, W. Gao, and Q. Wu, "Multi-objective optimization for the operation of distributed energy systems considering economic and environmental aspects," Appl. Energy, vol. 87, no. 12, pp. 3642-3651, Dec. 2010, doi: 10.1016/j.apenergy.2010.06.013.
- S. Yun, S. H. Han, H. Kim, and J. H. Ock, "Capital structure optimization for build-operate-transfer (BOT) projects using a stochastic and multi-objective approach," Can. J. Civ. Eng., vol. 36, no. 5, pp. 777-790, May 2009, doi: 10.1139/L08-134.
- M. Y. Jaber, C. H. Glock, and A. M. A. El Saadany, "Supply chain coordination with emissions reduction incentives," Int. J. Prod. Res., vol. 51, no. 1, pp. 69-82, Jan. 2013, doi: 10.1080/00207543.2011.651656.