과제정보
The support of the General Research Fund of the University Grants Committee of Hong Kong (#21212019) and City University of Hong Kong (#9239027) is gratefully acknowledged.
참고문헌
- C. Paraskevopoulou and A. Benardos, "Assessing the construction cost of Greek transportation tunnel projects.," Tunnelling and Underground Space Technology. vol. 38, pp. 497-505, 2013.
- I. Kurtulus and E.W. Davis, "Multi-Project Scheduling: Categorization of Heuristic Rules Performance.," Management Science. vol. 28, no. 2, pp. 161-172, 1982.
- S. Tsubakitani and R.F. Deckro, "A heuristic for multi-project scheduling with limited resources in the housing industry.," European Journal of Operational Research. vol. 49, no. 1, pp. 80-91, 1990.
- D.M. Tsai and H.N. Chiu, "Two heuristics for scheduling multiple projects with resource constraints.," Construction Management and Economics. vol. 14, no. 4, pp. 325-340, 1996.
- Y. Wang, Z. He, L.P. Kerkhove, and M. Vanhoucke, "On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem.," Computers and Industrial Engineering. vol. 114, no. October, pp. 223-234, 2017.
- H.J. Chen, G. Ding, J. Zhang, and S. Qin, "Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival.," Computers and Industrial Engineering. vol. 137, no. August, p. 106060, 2019.
- P.H. Chen and S.M. Shahandashti, "Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints.," Automation in Construction. vol. 18, no. 4, pp. 434-443, 2009.
- B. Said, "EARTHWORK ALLOCATIONS WITH LINEAR UNIT COSTS.," vol. 114, no. 4, pp. 641-655, 1989.
- M. Marzouk and O. Moselhi, "Multiobjective Optimization of Earthmoving Operations.," Journal of Construction Engineering and Management. vol. 130, no. 1, pp. 105-113, 2004.
- K. El-Rayes and A. Kandil, "Time-Cost-Quality Trade-Off Analysis for Highway Construction.," Journal of Construction Engineering and Management. vol. 131, no. 4, pp. 477-486, 2005.
- P.G. Ipsilandis, "Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects.," Journal of Construction Engineering and Management. vol. 133, no. 6, pp. 417-424, 2007.
- J.I. Kim, M. Fischer, and C. Kam, "Generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction.," Automation in Construction. vol. 96, no. October, pp. 378-397, 2018.
- A.K.W. Jayawardane and F.C. Harris, "FURTHER DEVELOPMENT OF INTEGER PROGRAMMING IN EARTHWORK OPTIMIZATION.," vol. 116, no. 1, pp. 18-34, 1990.
- N.N. Eldin and A.B. Senouci, "Scheduling and control of linear projects.," Canadian journal of civil engineering. vol. 21, no. 2, pp. 219-230, 1994.
- A. Myat, M. Paing, and N.L. Thein, "OPTIMIZING RESOURCE UTILIZATION FOR REPETITIVE CONSTRUCTION PROJECTS.," vol. 4, no. 3, pp. 85-99, 2012.
- T. Hegazy, "Optimization of construction time-cost trade-off analysis using genetic algorithms.," Canadian Journal of Civil Engineering. vol. 26, no. 6, pp. 685-697, 1999.
- A. Alshibani and O. Moselhi, "Fleet selection for earthmoving projects using optimization-based simulation.," Canadian Journal of Civil Engineering. vol. 39, no. 6, pp. 619-630, 2012.
- P. Ghoddousi, E. Eshtehardian, S. Jooybanpour, and A. Javanmardi, "Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm.," Automation in Construction. vol. 30, pp. 216-227, 2013.
- L.D. Long and A. Ohsato, "Fuzzy critical chain method for project scheduling under resource constraints and uncertainty.," International Journal of Project Management. vol. 26, no. 6, pp. 688-698, 2008.
- M. Lu, H.C. Lam, and F. Dai, "Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization.," Automation in Construction. vol. 17, no. 6, pp. 670-681, 2008.
- N.S. Kedir, S. Somi, A.R. Fayek, and P.H.D. Nguyen, "Hybridization of reinforcement learning and agent-based modeling to optimize construction planning and scheduling.," Automation in Construction. vol. 142, no. July, p. 104498, 2022.
- W. Genders and S. Razavi, "Asynchronous n-step Q-learning adaptive traffic signal control.," Journal of Intelligent Transportation Systems: Technology, Planning, and Operations. vol. 23, no. 4, pp. 319-331, 2019.
- G.H. Erharter, T.F. Hansen, Z. Liu, and T. Marcher, "Reinforcement learning based process optimization and strategy development in conventional tunneling.," Automation in Construction. vol. 127, no. December 2020, p. 103701, 2021.
- Z. Zhang, A. Chong, Y. Pan, C. Zhang, and K.P. Lam, "Whole building energy model for HVAC optimal control: A practical framework based on deep reinforcement learning.," Energy and Buildings. vol. 199, pp. 472-490, 2019.
- H. Berlink, N. Kagan, and A.H. Reali Costa, "Intelligent Decision-Making for Smart Home Energy Management.," Journal of Intelligent and Robotic Systems: Theory and Applications. vol. 80, pp. 331-354, 2015.
- R.S. Sutton and A.G. Barto, "Reinforcement Learning: An Introduction.," MIT press, 2018.