참고문헌
- T. Notteboom, F. Parola, G. Satta, M. Risitano, A taxonomy of logistics centres : overcoming conceptual ambiguity, Univ. Antwerpen 3 (2017) 276-299. https://doi.org/10.1080/01441647.2016.1231234.
- S. Zhou, Y.Y. Gong, R. De Koster, Designing self-storage warehouses with customer choice, Int. J. Prod. Res. 7543 (2016) 1-24. https://doi.org/10.1080/00207543.2016.1158880.
- F. Nemec, S. Lorincova, The Storage Area Market in the Particular Territory, 62 (2015) 131-138. https://doi.org/10.17818/NM/2015/SI8.
- R. Accorsi, R. Manzini, F. Maranesi, A decision-support system for the design and management of warehousing systems, Comput. Ind. 65 (2014) 175-186. https://doi.org/10.1016/j.compind.2013.08.007.
- V. Sanvido, M. Konchar, S. Moore, Comparison of project delivery systems, ASCE Constr. Congr. Proc. 124 (1997) 573-580. https://doi.org/10.1061/(asce)0733-9364(1998)124:6(435).
- T. Wegelius-Lehtonen, Performance measurement in construction logistics, Int. J. Prod. Econ. 69 (2001) 107-116. https://doi.org/10.1016/S0925-5273(00)00034-7.
- H. Nasir, C.T. Haas, J.H. Rankin, A.R. Fayek, D. Forgues, J. Ruwanpura, Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement, Can. J. Civ. Eng. 39 (2012) 957-967. https://doi.org/10.1139/L2012-030.
- W.D. Etgar Durio, Determining Key Performance Indicators With Balanced, J. Econ. Bus. UBS 12 (2023) 761-776.
- A. Hosseini, O. Laedre, B. Andersen, O. Torp, N. Olsson, J. Lohne, Selection criteria for delivery methods for infrastructure projects, Procedia - Soc. Behav. Sci. 226 (2016) 260-268. https://doi.org/10.1016/j.sbspro.2016.06.187.
- F. Nasirzadeh, N. Naderpajouh, A. Afshar, A. Etesami, FUZZY APPROACH TO PROJECT DELIVERY SYSTEM, Int. Conf. Constr. Eng. Proj. Manag. 03 (2007) 662-671.
- F. Yean, Y. Ling, S.L. Chan, E. Chong, L.P. Ee, Predicting Performance of Design-Build and Design-Bid-Build Projects, 130 (2004) 75-83. https://doi.org/10.1061/(ASCE)0733- 9364(2004)130.
- N.M. Oluvic, N.D. Ludlow, COMPARISON OF DESIGN-BUILD TO DESIGN-BID- BUILD AS A PROJECT DELIVERY METHOD, Nav. Postgrad. Sch. Monterey, Calif. (2001).
- R.E. Minchin, X. Li, R.R. Issa, G.G. Vargas, Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida, J. Constr. Eng. Manag. 139 (2013) 1-5. https://doi.org/10.1061/(asce)co.1943-7862.0000746.
- H. Moon, K. Kim, H.-S. Lee, M. Park, T.P. Williams, B. Son, J.-Y. Chun, Cost Performance Comparison of Design-Build and Design-Bid-Build for Building and Civil Projects Using Mediation Analysis, J. Constr. Eng. Manag. 146 (2020) 1-12. https://doi.org/10.1061/(asce)co.1943-7862.0001873.
- J. Park, Y.H. Kwak, Design-Bid-Build (DBB) vs. Design-Build (DB) in the U.S. public transportation projects: The choice and consequences, Int. J. Proj. Manag. 35 (2017) 280-295. https://doi.org/10.1016/j.ijproman.2016.10.013.
- P.P. Shrestha, J.D. Fernane, Performance of Design-Build and Design-Bid-Build Projects for Public Universities, J. Constr. Eng. Manag. 143 (2017) 1-10. https://doi.org/10.1061/(asce)co.1943-7862.0001241.
- J. Sullivan, M. El Asmar, J. Chalhoub, H. Obeid, Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality, J. Constr. Eng. Manag. 143 (2017). https://doi.org/10.1061/(asce)co.1943-7862.0001282.
- T. Yu, G.Q. Shen, Q. Shi, Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Methods, J. Constr. Eng. Manag. 143 (2017) 1-10. https://doi.org/10.1061/(asce)co.1943-7862.0001262.
- S. Yun, J. Choi, D.P. De Oliveira, S.P. Mulva, Development of performance metrics for phase-based capital project benchmarking, JPMA 34 (2016) 389-402. https://doi.org/10.1016/j.ijproman.2015.12.004.
- R. Khalef, S.M. Asce, I.H. El-adaway, F. Asce, Advancing Airport Project Delivery : A Comparison of Design - Build and Traditional Methods in Terms of Schedule and Cost Performance, 39 (2023) 1-18. https://doi.org/10.1061/JMENEA.MEENG-5490.
- H.S. Cha, C.K. Kim, Quantitative Approach for Project Performance Measurement on Building Construction in South Korea, 15 (2011) 1319-1328. https://doi.org/10.1007/s12205-011-1323-5.
- V. Sharma, C.H. Caldas, S.P. Mulva, Development of metrics and an external benchmarking program for healthcare facilities, Int. J. Constr. Manag. 21 (2021) 615-630. https://doi.org/10.1080/15623599.2019.1573490.
- A. Peressini, J. Bristow, M. Motahari, M. Karakouzian, U. Engineering, S. Branch, P. Drive, A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods, 9th Int. Conf. Constr. Eng. Proj. Manag. (2022) 669-677.
- G.C. Migliaccio, M. Asce, Empirical Comparison of Design / Build and Design / Bid / Build Project Delivery Methods, 135 (2009) 579-587. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000017.
- M. El Asmar, D. Ph, M. Asce, A.S. Hanna, D. Ph, F. Asce, W. Loh, D. Ph, Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems, 139 (2013) 1-14. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000744.