과제정보
본 논문은 국토교통부 "건설공사 사후평가지원센터 운영사업"의 일환으로 수행되었습니다(과제번호: 20230026-001).
The ripple effect is analyzed in the post-construction evaluation phase, but only the qualitative analysis and simple numerical fluctuations are analyzed, thus, no reliable ripple-effect analysis has been conducted. Therefore, in this study, a focus group interview was conducted with 10 experts to propose a plan to improve the ripple effect metrics. Consequently, by linking with the policy-effect metrics of the pre-feasibility study, it is expected that the utilization of the analysis results will be improved and objective and quantitative analysis will be possible.
본 논문은 국토교통부 "건설공사 사후평가지원센터 운영사업"의 일환으로 수행되었습니다(과제번호: 20230026-001).