과제정보
본 논문은 2021년 대동에스앤티의 지원으로 수행된 연구임을 밝히며 이에 감사를 드립니다.
Due to the inexperience of stone work and field workmanship, and the preference of simple construction, various problems such as unauthorized cutting of the touch and epoxy bonding are occurring. Therefore, the existing T-type hole construction method was developed to fundamentally control these attempts. As a result of comparison with the control panel method, vibration and noise were reduced by 2dB and 10dB, indicating an excellent effect. Particularly, dust was about 1/102~1/61 in individual values, and the average value was 1/80 (12.5%). The effect of preventing damage and environmental pollution is expected to be great.
본 논문은 2021년 대동에스앤티의 지원으로 수행된 연구임을 밝히며 이에 감사를 드립니다.