국제학술발표논문집 (International conference on construction engineering and project management)
- The 8th International Conference on Construction Engineering and Project Management
- /
- Pages.30-37
- /
- 2020
- /
- 2508-9048(eISSN)
Analysis and survey of design decision making process in steel production process
- Furukawa, Satoru (charge of IT, Mihama Steel Logistics Co.,Ltd.) ;
- Yoshida, Tomohiro (Kajima Corporation) ;
- Chi, Naiyuan (M.C.S. STEEL PUBLIC COMPANY LIMITED) ;
- Okamoto, Hiroyuki (M.C.S. STEEL PUBLIC COMPANY LIMITED) ;
- Furusaka, Shuzo (Open Innovation & Collaboration Research Organization Global Management of Technology Center, Ritsumeikan University)
- 발행 : 2020.12.07
초록
In the building construction, the steel-frame work occupies an important position in terms of structure, cost and quality. Especially in Japan, steel frames have traditionally been the main structure of many buildings. For steel-frame works in such positions, this paper investigates an existing steel fabricator to clarify the actual conditions of design decision making process and management method in steel production process. This study focuses on a steel fabricator (Company M in the following sentences), whose main market is Japan and which has facilities in Thailand, China, and Japan. Company M uses QR codes to control the production status of products, and exchanges all information between inside and outside the company via specialized departments in the form of documents. The authors have already analyzed the relationship between production lead time and defect rate based on actual project data at Architectural Institute of Japan in 2016. In 2019, we expressed the process from the confirmation of the design information of the current steel frame to the production by WBS, and clarified the relationship between the production lead time and steel frame product quality structurally. In this paper, the authors reoport the progress of the survey conducted so far, the positioning of the collected data, and the future survey policy.
키워드