Optimization of Luffing-Tower Crane Location in Tall Building Construction

  • Lee, Dongmin (School of Civil, Environmental and Architectural Engineering, Korea University) ;
  • Lim, Hyunsu (School of Civil, Environmental and Architectural Engineering, Korea University) ;
  • Cho, Hunhee (School of Civil, Environmental and Architectural Engineering, Korea University) ;
  • Kang, Kyung-In (School of Civil, Environmental and Architectural Engineering, Korea University)
  • Published : 2015.10.11

Abstract

The luffing-tower crane (T/C) is a key facility used in the vertical and horizontal transportation of materials in a tall building construction. Locating the crane in an optimal position is an essential task in the initial stages of construction planning. This paper proposes a new optimization model to locate the luffing T/C in the optimal position to minimize the transportation time. An optimization algorithm, the Harmony Search (HS) algorithm, was used and the results show that HS has high performance characteristics to solve the optimization problem in a short period of time. In a case study, the proposed model offered a better position for T/C than the previous heuristic approach.

Keywords

Acknowledgement

This research was supported by a grant(14CHUD-B059157-06) from High-tech Urban Development Program funded by Ministry of Land, Infrastructure and Transport of Korean government.