Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2015.07a
- /
- Pages.155-156
- /
- 2015
A Study on Operation Scheme of STS with Emergency Generator for Peak Shedding
첨두부하 저감을 위한 비상발전기 연계형 STS 운영 방안에 관한 연구
- Kim, Chang-Hwan (Yeungnam University) ;
- Rhee, Sang-Bong (Yeungnam University) ;
- Kim, Kyu-Ho (Hankyong National University)
- Published : 2015.07.15
Abstract
Recently, electricity consumption has rapidly increased along with economic growth. The operating strategy using emergency generator is aimed, to resolve a demand response management. For strategy of peak shedding using emergency generator, it is essential to introduce the fast transfer switching device. One of the most effective solutions is to use a static transfer switch (STS) based on thyristor. However, the characteristic of natural commutated SCR thyristor should anticipate short duration voltage sag. STS system thus requires more than a quarter cycle to successfully complete transfer process. This paper proposes the operation scheme of the STS system using the forced-commutation technique to mitigate instantaneous voltage sag during peak transfer process. Proposed STS system improved turn-off characteristic thus accomplishes the peak load shedding satisfied power quality. Performance of the proposed STS system is evaluated using electromagnetic transient program (EMTP) to confirm the effectiveness.
Keywords