Implementation of Cable Drum Scheduling Algorithm for Productivity Enhancement of Power Plant Electrical Installations

발전소 전기설비의 생산성 향상을 위한 케이블 드럼 스케줄링 알고리즘 구현

  • Published : 2015.10.26

Abstract

In this paper, we proposed and implemented the automation of cable drum scheduling which is required a considerable construction cost for electrical equipment in power plant. Implemented cable drum scheduling can be reduced the calculation time of cable drum scheduling, and it is possible to minimize the consuming time of cable drum scheduling than conventional methods. Some experiments are conducted to verify the proposed method, and as a result, the automation of cable drum scheduling is well performed, enabling cables can be optimized and scheduled to fit the drum capacity with productivity enhancement of electrical installations.

본 논문에서는 발전소 전기설비 및 구축비용의 상당부분을 차지하는 케이블의 손실자원을 최소화하고, 효율적인 케이블 자재관리가 가능한 케이블 드럼 스케줄링 자동화를 제안하고 구현하였다. 구현된 케이블 드럼 스케줄링은 기존 수기방식의 케이블 드럼 계산에 소요되는 소비시간을 최소화하고, 종류별 케이블들을 케이블 드럼 총용량에 최적화함으로써 전기설비 생산성을 향상시킬 수 있다.