Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2011.07a
- /
- Pages.1820-1821
- /
- 2011
Anaysis of Equipment Qualification Tests for IMCS(Integrated Monitoring & Control System) in Thermal Power Plants
화력발전소 통합감시제어시스템의 기기검증시험 사례 분석
- Shin, Man-Su (KEPCO Research Institute) ;
- Lee, Joo-Hyun (KEPCO Research Institute) ;
- Park, Du-Yong (KEPCO Research Institute) ;
- Byun, Seung-Hyun (KEPCO Research Institute) ;
- Choi, In-Kyu (KEPCO Research Institute) ;
- Lee, Se-Gyeong (Doosan Heavy Industries & Construction)
- 신만수 (KEPCO 전력연구원) ;
- 이주현 (KEPCO 전력연구원) ;
- 박두용 (KEPCO 전력연구원) ;
- 변승현 (KEPCO 전력연구원) ;
- 최인규 (KEPCO 전력연구원) ;
- 이세경 (두산중공업 기술연구원)
- Published : 2011.07.20
Abstract
The equipment qualification test was accomplished before application to power generating stations because troubles in applying to real system could be prevented trough the test. That is, if a system was judged to be suitable in the equipment qualification test, the system was expected to be operated stable to the designed life.
Keywords