배전계통 고조파 상시감시 시스템 구축 및 측정사례

A case of the PQMS construction in the distribution power system

  • 박용업 (한국전력공사 전력연구원) ;
  • 최선규 (한국전력공사 전력연구원) ;
  • 이병성 (한국전력공사 전력연구원)
  • 발행 : 2011.07.20

초록

Recently, the korea power quality standard has been established based on the IEC Std. By IEC Std., the power quality assessment point is measured in PCC. In this case, the utility has to construct PQM system in all customer PCC point and the PQ meter cost would be very high in order to acquire the suitable data. Accordingly the utilities could not apply to PQM system in the distribution power system by the cost and communication problem. In this paper, the proposed economical PQMS(Power quality monitoring system) of Utility.

키워드