A dropper length calculation method of the elevating span in overlap area

무효 인상 경간에서 드로퍼 길이 계산 기법

  • 권삼영 (한국철도기술연구원, 고속철도본부) ;
  • 이기원 (한국철도기술연구원, 고속철도본부) ;
  • 조용현 (한국철도기술연구원, 기술전략실)
  • Published : 2011.10.20

Abstract

The dropper length calculation method about the normal same encumbrance spans is well known independent to whether the pre-sag is given or not. But, the dropper length calculation method for the elevating span which consists in the end area of a tensioning section and normally consists with overlaps is not well known. In this study, firstly, we investigate the dropper length calculation method about the elevating span whether the insulator is contained in or not, we also recognize the effect of dropper length due to the change of the take-off point. Secondly, we very this calculation method with a catenary sample data and check again with Gyeongbu HSL design data.

Keywords