Proceedings of the KSR Conference (한국철도학회:학술대회논문집)
- 2011.10a
- /
- Pages.412-419
- /
- 2011
Track Stability in Accordance with the Depth of Soil above Box Structures Constructed by Non-excavation Method on Railway Embankment
철도하부 비개착공법을 이용한 BOX구조물 설치시 토피고에 따른 궤도구조 안전성에 관한 연구
- Published : 2011.10.20
Abstract
With an increase in rail traffic, developing activities around structures of railway have been expanded. Inevitably, the changes to cross though sub-structures of railway have been getting increased. However, this situation affects on the safe operation of trains. Generated wheel load makes on the result in settlement on roadbed and damages on track materials. Therefore, via the numerical analysis were carried out for the box structure and subground using FEM analysis program called. Visual FEA/Geo 4.19. Parametric studies were performed by changing soil depth above box structure constructed in railway embankment. A standard live load was applied to simulate loads from train. Through this study, a minimum required soil depth above subground box structure was recommended based on deformation and stresses in concrete railway system.
Keywords