A Case of the Alternative Method to Improve the Ambient Vibration Blasting Method Applied NATM Tunnel Construction in Urban Areas

도심지 NATM 터널 굴착시 적용된 미진동발파 공법 개선사례

  • Published : 2010.03.25

Abstract

Various difficulties have been increased in the construction of public structure; like the road in the overcrowding urban area, because of civil complaint, cost and period of construction. In oder to overcome these social problems, the tunnel has been planned the road design. Despite the resolution, there are many technical problems when constructed near facilities. The design of new tunnel below the existing service reservoir is applied to the ambient vibration blasting using Plasma. The result of test blasting was exceeded the standard ("2kine"). So it was considered a countermeasure for the vibration reduction applied to change the controlled blasting method, reduce the charge, add the pre middle horizontal hole in the cut blasting site, and so on. The result was satisfied the standard. Accordingly, if the quality of blasting process can be managed well, the application of this alternative method is highly effective one. Also, based on cost analysis between two methods, the alternative method is very competitive.

Keywords