Establishing performance test center for a small hydropower

소수력 발전설비의 성능시험센터 구축

  • 김영준 (한국수자원공사 K-water연구원) ;
  • 김상균 (한국수자원공사 K-water연구원) ;
  • 이동근 (한국수자원공사 K-water연구원) ;
  • 박주영 (한국수자원공사 K-water연구원)
  • Published : 2009.06.25

Abstract

Currently in Korea, the lack of facilities and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic small hydropower turbine, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore Korean institute of water and environment in K-water planned making a basis of performance test of small hydropower by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system. Improving the efficiency of small hydropower system can achieve the additional development benefit about 1.5 billion won per year.

Keywords