한국신재생에너지학회:학술대회논문집
- 한국신재생에너지학회 2009년도 추계학술대회 논문집
- /
- Pages.610-613
- /
- 2009
울돌목 시험조류발전소의 기초 시공 사례
A Case Study on the Foundation Work of Uldolmok Tidal Current Power Plant
초록
Uldolmok tidal current power plant was constructed on May 2009 at Jindo Gun in Korea. However it had much trouble in installing structure due to the extremely fast tidal current velocity(max. 5.5m/sec) and the jacket type plant structure. Therefore in this paper, The characteristics of tidal current and sea bed topography at Uldolmok tidal current plant site are investigated, and the detailed foundation work process of the plant is described.
키워드