A Case Study on the Foundation Work of Uldolmok Tidal Current Power Plant

울돌목 시험조류발전소의 기초 시공 사례

  • 권오정 (한국해양연구원 연안개발.에너지연구부) ;
  • 오명학 (한국해양연구원 연안개발.에너지연구부) ;
  • 박진순 (한국해양연구원 연안개발.에너지연구부) ;
  • 이광수 (한국해양연구원 연안개발.에너지연구부)
  • Published : 2009.11.25

Abstract

Uldolmok tidal current power plant was constructed on May 2009 at Jindo Gun in Korea. However it had much trouble in installing structure due to the extremely fast tidal current velocity(max. 5.5m/sec) and the jacket type plant structure. Therefore in this paper, The characteristics of tidal current and sea bed topography at Uldolmok tidal current plant site are investigated, and the detailed foundation work process of the plant is described.

Keywords