국제학술발표논문집 (International conference on construction engineering and project management)
- The 3th International Conference on Construction Engineering and Project Management
- /
- Pages.914-919
- /
- 2009
- /
- 2508-9048(eISSN)
Can you predict the production performance using the make-ready performance?: Cases on highway construction projects
- Yong-Woo Kim (School of Built Environments, University of Washington) ;
- Jinwoo Jang (Ilyang Construction Inc.)
- 발행 : 2009.05.27
초록
The research investigates for the relationship between the operating performances of the make-ready process and project production performance. To this end, the researchers proposed a metric of PCR (Percentage of Constraint Removal) to measure the make-ready performance. The study measured the production performance in two ways: production planning reliability and progress performance. We hypothesized that how well the make-ready process is performed has an impact on the degree of production performance. The statistical analyses are used to investigate that how operating performance of the make-ready process affects project production performance. The results of the regression analysis support our hypotheses (p<0.25) and correlation coefficients for the relationship between project production performance and make-ready performance are also significant (p<0.05).