PRELIMINARY PROJECT OF WATER SUPPLY FOR NDATA FARM, MALAWA

  • 발행 : 2009.05.27

초록

The water resources project of 320 Ha second stage reclamation, in which including an University City, out of 800 Ha Ndata Farm, Malawa, had been under studied in this research. The challenge of C value of runoff coefficient was obtained as 0.8, by introducing the attenuation factors method, proposed by second author, an IDF dimensionless method customary used in Taiwan, proposed by the third author, is translated further to solve the project design rainfall; Rational Method, thus, obtains 11.5 CMS as the 5 year recurrence storage. The final job, completed by the third author's on-site performance, includs field alignments and discussions with the trustee, Malawa President H. E. Dr. Bingu Wa Mutharika, when a special concern of anti-theft. In order to provide sufficient supply up to an amount of 44,000 M3 during April to November, the sketch package includes 6 measurements: one water barrage, one sluice gate, one intake, one sediment reservoir, one water reservoir, and 3199 Km long gravity-driving hydraulic pipe.

키워드