Proceedings of the Korea Water Resources Association Conference (한국수자원학회:학술대회논문집)
- 2008.05a
- /
- Pages.1-8
- /
- 2008
'Design and Construction of 7 kilometres of 2.5 cubic metre per second Canal'
- Euinton, Gordon (Riley Consultants Ltd.) ;
- Tate, Don (Riley Consultants Ltd.)
- Published : 2008.05.22
Abstract
The paper describes the process and issues encountered during the design and construction of seven kilometres of canal to convey 2.5 cumecs of flow to two power stations. The location of the scheme above the primary reservoir of the Waipori Hydropower scheme in Otago, New Zealand, utilising an existing stream diversion into this reservoir, means that no new water abstraction or diversion consents were required. This mini hydro development associated with the existing Waipori scheme was partly justified by an allocation of carbon credits. The scheme controls are slightly more complicated than many canal and penstock schemes as the canal lengths are considerable in relation to the gradient.
Keywords