Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 2008.10a
- /
- Pages.700-707
- /
- 2008
Estimation of Optimum Pile length Using Various Prediction
다양한 예측기법을 이용한 현장타설말뚝의 최적길이 산정
- Choi, Young-Seok (Yooshin Corporation Engineering) ;
- Iim, Hyung-Joon (Yooshin Corporation Engineering) ;
- Song, Myung-Jun (Hyundai Institute of Construction Technology) ;
- Jang, Hak-Sung (2nd Department of Geotechnical and Tunnel Design, Yooshin Corporation Engineering)
- Published : 2008.10.10
Abstract
As plan connecting island to island or island to land is needed, a lot of long-span bridge is being designed lately in Southern part of Korea. With development of pile equipment, overhanging large-scaled concrete pile are adopted to foundation type of main tower or pylon. About the number of 15~30 group piles per tower foundation is designed to resist long-spaning super-structure load, but by restricted condition of site investigation cost, a few boring-hole tests are performed to identify sub-ground layers. Up to now, direct-curved method connecting two or three known boring logs and representative interval method are usually used to evaluate unknown depth and rock properties at locations where piles are constructed. Because this approach is not logical and so rough, much difference occurs between designed length of piles and real length of it. In this paper, using a lot of various prediction method(reciprocal distance method, inverse square distance method and kriging method etc.), we suggest optimum length of group piles.
Keywords
- group pile;
- pile length;
- direct-curved method;
- representative interval method;
- reciprocal distance method(RDM);
- inverse square distance method(ISDM) and kriging method