Feasibility Study for the Ghana-Mali 225kV Interconnection Project

서부아프리카 국가간 연계 송전망 타당성 조사

  • Published : 2008.07.16

Abstract

KEPCO conducted the project called the "Feasibility Study for the Han (Ghana) - Bobo Dioulasso (Burkina Faso) - Bamako (Mali) Interconnection Project" as its first African project. This paper deals with power system analysis and Transmission line and substation design of approximately 750 kilometers of the 225 kV single circuit transmission lines and six substations. The main contents of the power system analysis results and preliminary engineering design include power flow, transient stability, eigenvalue analysis, transmission line design, substation design and economic analysis.

Keywords