Analysis of post-construction deformation characteristics of concrete faced rockfill dams

  • Kim, You-Seong (Dept. of Civil Engineering., Chonbuk National University) ;
  • Won, Myoung-Soo (Dept. of Civil Engineering., Kunsan National University) ;
  • Song, Young-Chul (Structural Engineering Lab., Korea Electric Power Research Institute) ;
  • Yoon, Deok-Joong (Structural Engineering Lab., Korea Electric Power Research Institute)
  • 발행 : 2007.09.14

초록

To get the possible for management and maintenance, it was analyzed the deformation characteristics, such as crest of embankment and concrete face slab, and leakage of concrete faced rockfill dams (CFRD). There are trends that embankment deformation depends on intact strength used rockfills rather than dam height, deformation normal to concrete face slab during the first reservoir filling is occurred more than 80% of the total deformation in general, and the magnitude and trend of concrete face slab deformation is similar to post-construction crest settlement. The results showed that the range of post-construction crest settlement suggested by Sherard and Cooke (1987), and Clements (1984) had a good agreement in the cases using rockfill with very high intact strength, but it had a trend which underestimated crest settlement in the cases using rockfill with medium to high intact strength. The maximum leakage rate in general was observed during the first reservoir filling and long-term leakage rate was rapidly increased when the dam height exceeds approximately 120m.

키워드