Generator Testing and Model Validation for Thermal Plant

전력계통 안정성 향상을 위한 발전기 제어계 특성시험 및 모델링

  • Cha, S.T. (Korea Electric Power Research Institute, KEPCO) ;
  • Kim, Y.H. (Korea Electric Power Research Institute, KEPCO) ;
  • Oh, S.I. (Korea Electric Power Research Institute, KEPCO) ;
  • Choi, J.H. (Korea Electric Power Research Institute, KEPCO) ;
  • Shin, J.H. (Korea Electric Power Research Institute, KEPCO) ;
  • Shim, E.B. (Korea Electric Power Research Institute, KEPCO) ;
  • Kwak, N.H. (Korea Electric Power Research Institute, KEPCO) ;
  • Son, H.I. (Korea Electric Power Research Institute, KEPCO)
  • Published : 2007.07.18

Abstract

The Jeju power grid experienced several major power disturbances over the last decade. The postmortem studies of the incidents indicated that some of the generating units did not respond as predicted by system analysis & studies. Consequently, the Korean Power Exchange (KPX) mandated that all units (generators, excitation, governor and turbine systems) in the Korean network greater than or equal to 20MVA be tested to verify the generator reactive power limits as well as the dynamic model data being used for system studies. This paper presents field experiences of the authors in testing and modeling of steam turbines and their associated governors during the generator and model validation.

Keywords