Study of Determination of Allowable Residual Settlement of Concrete Track Roadbed for High-Speed Railway

콘크리트궤도 토공노반의 허용잔류침하량 결정에 관한 연구

  • 이일화 (한국철도기술연구원 궤도토목연구본부) ;
  • 양신추 (한국철도기술연구원 궤도토목연구본부) ;
  • 장승엽 (한국철도기술연구원 궤도토목연구본부)
  • Published : 2007.11.08

Abstract

An active application of concrete track is being expected for the future construction of Korean railroad. For the successful concrete track construction and design in earthwork areas, the residual settlement should be reasonably estimated using the proper method. The concrete track is extremely vulnerable to the damage of residual settlement. However, at the transition areas such as bridge approach, differential settlement will likely occur due to difference of stiffness, poor drainage and poor ground treatment. The maintenance is very difficult for excessive settlement on existing line, it is need to constrain the residual settlement in step of design. In this paper, it is performed the determination of the allowable residual settlement through various study to understand the residual settlement behavior of concrete track roadbed.

Keywords