A Study on Optimal Cable Prestressing and Fabrication Camber of Wando Bridge

완도대교의 최적 케이블장력 및 제작 Camber 산정에 관한 연구

  • 이태열 (삼성물산 건설부문 토목기술팀) ;
  • 김영훈 (삼성물산 건설부문 토목기술팀) ;
  • 김재권 (삼성물산 건설부문 토목기술팀) ;
  • 강성원 (삼성물산 건설부문 완도대교 현장 설계과)
  • Published : 2006.04.01

Abstract

Cable-stayed bridge is a bridge that consists of one or more pylons, with cables supporting the deck. Cable-stayed bridges have come into wide use recently because of their economy, stability, and excellent appearance. It is possible to achieve a uniform moment distribution in the stiffening girders mainly by prestressing the cables, which leads to a more economical design in material and weight than other types of bridges. However, to achieve a more uniform moment distribution is vague objective, so it cannot be easily defined as the optimization problem. In other words, the minimization of cost or weight as the objective is not directly related to the optimization of cable prestressing. Therefore, it has been considered as one of the most important, difficult and also interesting topics among many researchers and bridge engineers to determine the optimal tensioning strategy how to apply prestressing forces of the cables of cable-stayed bridge. A number of approaches (Wang et al. 1993, $Negr\~{a}o\;and\;Sim\~{o}es$ 1997, Agrawal 1997, Janjic et al. 2003) to determine the optimal cable tensions have been proposed in the literature. Among these approaches the unit load method (Janjic et al. 2003) is considered in this paper because it can take into account the actual construction process while other approaches are based on the configuration of the final structure only. In this paper, '2-step approach' based on the unit load method is proposed to find the optimal tensioning strategy especially for the atypical asymmetric bridge under construction, which has continuous deck supported by one pylon and stay cables. Some numerical results will be given to show the validity of the new approach suggested in this paper.

Keywords