수치시뮬레이션에 의한 방파제의 시공계획

The Construction Plan of Breakwater by the Numerical Simulation

  • 김규한 (관동대학교 토목공학과) ;
  • 윤성진 (관동대학교 첨단해양공간연구센터) ;
  • 김영복 (관동대학교 대학원)
  • 발행 : 2006.11.16

초록

The main external force of the harbor in east coast is wave. So, wave is the important cause of wave induced current and sediment transport due to wave in planning harbor structures. Therefore, it must be considered not only to secure the harbor tranquility but also the sediment transport due to wave induced current in planning the harbor. In this study, we studied on the influences of construction procedure on harbor tranquility and siltation using annual coastal line data and bathymetry data near breakwater. And it suggests that the construction procedure for the harbor tranquility and the best way for the decrease of harbor siltation.

키워드