한국해양공학회:학술대회논문집 (Proceedings of the Korea Committee for Ocean Resources and Engineering Conference)
- 한국해양공학회 2006년 창립20주년기념 정기학술대회 및 국제워크샵
- /
- Pages.449-452
- /
- 2006
수치시뮬레이션에 의한 방파제의 시공계획
The Construction Plan of Breakwater by the Numerical Simulation
-
Kim, Kyu-Han
(Dept. of Civil Engineering, Kwandong University) ;
- Yoon, Seong-Jin (RIC, Kwandong University) ;
- Kim, Young-Bok (Graduated school, Kwandong University)
- 발행 : 2006.11.16
초록
The main external force of the harbor in east coast is wave. So, wave is the important cause of wave induced current and sediment transport due to wave in planning harbor structures. Therefore, it must be considered not only to secure the harbor tranquility but also the sediment transport due to wave induced current in planning the harbor. In this study, we studied on the influences of construction procedure on harbor tranquility and siltation using annual coastal line data and bathymetry data near breakwater. And it suggests that the construction procedure for the harbor tranquility and the best way for the decrease of harbor siltation.
키워드