The evaluation of applicability for several final settlement prediction methods to field settlement management by measurement results carried on embankment on the soft clays

계측결과를 이용한 연약지반상 성토시의 최종침하량예측기법들의 현장적용성

  • Kim, Jong-Ryeol (Dept. of Civil Engineering, Chonnam National Univ.) ;
  • Gang, Hee-Bog (Dept. of Civil & Environmental Engineering, Hanyeong College.) ;
  • Choi, Ju-Myoung (Civil Engineering & Tech. Team, Samsung Corporation.) ;
  • Hwang, Soung-Won (Dept. of Civil Engineering, Chonnam National Univ.) ;
  • Kim, Woo-Jin (Dept. of Civil Engineering, Chonnam National Univ.)
  • 김종렬 (전남대학교 공과대학 토목공학과) ;
  • 강희복 (한영대학 토목환경과) ;
  • 최주명 (삼성물산(주) 건설부분 토목기술팀) ;
  • 황성원 (전남대학교 공과대학 토목공학과) ;
  • 김우진 (전남대학교 공과대학 토목공학과)
  • Published : 2005.03.25

Abstract

In this study, we intended to compare and examine several settlement management methods by analyzing measurement results of a site of the industrial complex at ${\bigcirc}{\bigcirc}$ province. We predicted and analyzed the amount of final settlement by using generally used final settlement methods as like Hyperbola method, Hoshino methods and Asaoka method. And then, We compared the predicted results with that of measurement. On the basis of comparison of the three methods, Hyperbola method was the most convenient and accurate method of the three methods and if a sufficient time was given enough after embankment construction, the use of Hoshino method was possible. In the case of the Asaoka methods, it was possible to know that it had an approaching tendency to the measured one with increasing time interval spent on analysis. Therefore, in order to predict settlement behavior more accurately it is needed to understand their advantages and shortcomings sufficiently and pay attention to application to the real site.

Keywords